PTA Trail Maintenance, Big Island, HI​

PTA Trail Maintenance, Big Island, HI Demolition and reconstruction of (17) Stationary Armored Targets (SATS), 3 Moving Infantry Targets (MITs) and 4 Power Centers (PCs).

MPTR Retaining Walls, JBER, AK​

MPTR Retaining Walls, JBER, AK Demolition and reconstruction of (17) Stationary Armored Targets (SATS), 3 Moving Infantry Targets (MITs) and 4 Power Centers (PCs).

A-77 and B-76 Urban Villages Container Retrofit, Eglin AFB, FL​

A-77 and B-76 Urban Villages Container Retrofit, Eglin AFB, FL Remove and replace existing exterior doors and windows of containers. Repair all damage to containers by rust removal, grinding and welding. Install new metal sheeting for a solid building wall surface and Cement Based Protective Coating to containers to depict an Overseas Village.

Marine Corps Rifle Range, Parris Island, SC​

Marine Corps Rifle Range, Parris Island, SC Demolition and reconstruction of an existing Marine Corps rifle range. Work incudes, Storm sewer, Earthwork, Aggregate roadways, Berm demolition and reconstruction.

Wheeled Vehicle Drivers Course M88, Fort Leonard Wood, Missouri

Wheeled Vehicle Drivers Course M88, Fort Leonard Wood, Missouri This was a Design Build project which included over 38 acres of heavy clearing and grubbing for construction of a 3-mile driver’s course and support facilities including; site civil work and infrastructure for Three (3) GIB (general instruction buildings), rehab of existing stone hardstand to concrete pavement, […]

Volar Barracks Repave, Fort Riley, Kansas

Volar Barracks Repave, Fort Riley, Kansas Project included milling and repaving of barracks parking lots, replacement of parking lot light fixtures, replacement of walkway lights, and concrete site repair.

SATOC – Site 4 MP Battalion CHBD Site Infrastructure Ft. Riley, Kansas

SATOC – Site 4 MP Battalion CHBD Site Infrastructure Ft. Riley, Kansas The work included the design and construction of site and infrastructure improvements for a Battalion Head Quarters, Company Operations Facility and a Tactical Equipment Maintenance Facility.  The project had time critical intermediate due dates for three building pads. The project consisted of; clearing, […]

SATOC – Combat Engineer Battalion Complex Site Work Site 5, Fort Riley, Kansas

SATOC – Combat Engineer Battalion Complex Site Work Site 5, Fort Riley, Kansas The work included the design and construction of site and infrastructure improvements consisting of: erosion control, clearing, grubbing, earthwork, grading and compaction, building pads, asphalt paving, sediment ponds, concrete curbs/gutters, concrete retaining wall, installation of site utilities to include the storm drainage […]