Pistol Live Fire Training Range, Camp Beauregard, LA

Pistol Live Fire Training Range, Camp Beauregard, LA The Camp Beauregard 70 Yard Range was designed and constructed for the US Marshals Service.  The Range provides a 70 yard, 40 position qualification range.  The facility consists of independent banks of edge/face target systems with multiple barricade obstacles per firing lane.  Exterior lighting was provided to […]

Recreational Area Latrines, Fort Riley, KS

Recreational Area Latrines, Fort Riley, KS The Recreational Latrines are a $500,000 design build project on Fort Riley.  The work includes design of the latrines and the new utility system to support the facilities,  placement of three pre-cast  wet latrine buildings and infrastructure improvements.  RACC’s work includes:  erosion control, stripping of topsoil, earthwork, grading and compaction, […]

ANG Mout Training Facility Salina, Kansas

ANG Mout Training Facility Salina, Kansas The project consisted of five separate Villages spread throughout the Air National Guard Smoky Hill Range.  Each Village required the stripping of topsoil, grading of sub grade, installation of crushed stone aggregates for main/center roads, connector roads and building pads/foundations. Placement of topsoil and permanent seeding on disturbed areas […]

Automated Record Fire Range, Fort McCoy, WI

Automated Record Fire Range, Fort McCoy, WI Construction of Automated Record Fire (ARF) Range including Operations Storage Building, Range Operation Center Tower, Classroom, Covered Bleacher, Covered Mess, Ammo Breakdown Building and Wet Latrine. The ARF Range has 16 lanes, each being 20 meters wide. The ARF contains 16 precast concrete Firing Positions, 120 SIT Emplacements, […]

Modified Record Fire Range Ft. Sill, Oklahoma

Modified Record Fire Range Ft. Sill, Oklahoma The 16 Lane Modified Record Fire training range project site is situated on approximately 32 acres of open rolling prairie.  The project required 5,000 LF of silt fence to be installed, approximately 80,000 cubic yards of earthwork, RCP culverts, installation of 144 precast concrete Stationary Infantry Targets, construction of […]

POCA – CACTF III Repairs 1 and 2, Fort Riley, Kansas

POCA – CACTF III Repairs 1 and 2, Fort Riley, Kansas Task Order 0001 consisted of completing work items left by prior design-build contractor as well as punch-list items for prior design-build contractor.  The work consisted of:  site regrading, culverts, riprap installation, ditch regrading, sub-drains, area inlets, pipe bollards, caulking, roof repairs, fencing, HVAC, doors […]

Multi-Purpose Machine Gun Range Range 24, Fort Leonard Wood, Missouri

Multi-Purpose Machine Gun Range Range 24, Fort Leonard Wood, Missouri Range 24 is a $6.1 million Design/Build project for the USACE at Ft Leonard Wood, MO. This project includes the demolition of the old range and range buildings, construction of a new 8 lane 1500 Meter range, access roads and new range support buildings including […]

Combat Pistol Qualification Course Range 21, Fort Leonard Wood, Missouri

Combat Pistol Qualification Course Range 21, Fort Leonard Wood, Missouri The project consisted of 15 firing lanes, with the installation of pre-engineered buildings for a Control Tower, General Instruction Building, Operation/Storage Building, Ammo Breakdown, Covered Mess, Latrine, Bleacher Enclosure, and an adjacent roadway and parking lot.  RACC self-performed the clearing and grubbing, earthwork, crushed stone […]

Modified Record Fire Ranges 7 and 8, Fort Leonard Wood, Missouri

Modified Record Fire Ranges 7 and 8, Fort Leonard Wood, Missouri The two 16 lane Modified Record Fire Training Ranges are located at the site of old Range 8.  The project required clearing and grubbing, of approximately 60 acres of trees and vegetation, demolition/recycling of 2 buildings, 32 firing positions and 144 Stationary Infantry Targets, […]

Live Fire Structural Collapse Facility, Fort McCoy, WI

Live Fire Structural Collapse Facility, Fort McCoy, WI The Live Fire Structural Collapse Facility was designed and constructed to provide a realistic training scenario intended to simulate an urban environment with restricted entry and exit pathways.  The facility includes simulated collapsed entrances and underground passages.  The facility is constructed entirely of SACON to allow for […]