The Central Vehicle Wash Facility is a $2.8 million dollar project at Fort Leonard Wood, MO. The work includes the construction of 2 intermittent sand filters, 2 settlement basins, an equalization basin, a finish water supply basin, a control building and a tracked vehicle bath.
RACC’s work includes: demolition, erosion control, stripping of topsoil, earthwork, grading and compaction, importing all aggregates, retention pond liners, placement of topsoil, installation of a sanitary and storm sewer system, subsurface waterlines, temporary and final seeding, and placement of precast concrete structures.