Combat Pistol Qualification Course Range 21, Fort Leonard Wood, Missouri
The project consisted of 15 firing lanes, with the installation of pre-engineered buildings for a Control Tower, General Instruction Building, Operation/Storage Building, Ammo Breakdown, Covered Mess, Latrine, Bleacher Enclosure, and an adjacent roadway and parking lot. RACC self-performed the clearing and grubbing, earthwork, crushed stone parking and maintenance roads, installation of 120 precast concrete Stationary Infantry Targets, installation of 15 precast Firing Positions, building pads including the excavation and backfill of foundations, trenching for and installation of the stormwater drainage system, and temporary and permanent seeding of the site.